The goal of the Bullitt Center is to drive change in the marketplace faster and further by showing what’s possible today. The Bullitt Center was designed to show what’s possible today, changing the way people think about high performance green building. While the building includes many innovations, in reality every feature of the building is being used elsewhere in the world. However few, if any, projects have managed to put together so many systems, design features and construction techniques.

Following are just some of the key features of this remarkable building.

WARMTH FROM BELOW
Spaces are heated with warm water circulated in tubes embedded in concrete floor plates.

  • 26 closed-loop wells take a mixture of water and glycol 400 feet down into the earth
  • The baseline ground temperature is 53 degrees

SUSTAINABLE CITY SERVICES
Dense, diverse neighborhoods encourage walking, bicycling and transit.

  • There are 20+ bus routes, a streetcar (in 2014) and lightrail (in 2016) within 1/2 mile
  • There are 20+ Zipcars and Car2Go within 1/2 mile
  • The Bullitt Center’s location has a walk score of 99/100

ZERO NET ENERGY
Net zero energy is possible, even in Seattle.

  • Connected to the grid, where excess power is stored
  • One meter measures energy sold to Seattle City Light, one measures energy purchased

COMPUTER CONTROLLED SYSTEMS
Computers automatically adjust passive and active systems to keep the building comfortable and efficient.

  • Like the brain, the systems help the building respond to and interact with the environment
  • Controls include Heating/Cooling, Passive/Mechanical Ventilation, daylighting and metabolic systems

WATERLESS WASTE
Extremely low-flow toilets reduce water use.

  • Toilets use only two tablespoons of water mixed with biodegradable soap to foam the bowl.
  • Toilets and urinals return air to the aerobic composters.

Bullitt Center Composting ToiletsCOMPOSTING WASTE
The world’s only six-story composting toilet system.

  • Human waste is transferred to composters and periodically taken offsite to be used as fertilizer.
  • Aerobic digestion heats material to 190 degrees and converts solid waste to compost.

WASTEWATER USE
The project reconnects the hydrologic cycle by infiltrating clean water back into the ground.

  • Water from sinks and showers is stored in a greywater tank and cleaned in a constructed wetland.
  • Clean greywater is infiltrated back into the soil to recharge the local aquifer.

RETURNING WATER WORKS
Like a Doug fir forest, the Bullitt Center returns water to the soil and atmosphere.

  • The building will restore the historical relationship of water to the land by collecting rain, returning it to the earth and the atmosphere.
  • 61% of the water in a Douglas fir forest evaporates or infiltrates into the ground, similar to the grey-water treatment in the Bullitt Center.

A REGENERATIVE LIFT
Regenerative technology increases efficiency of the KONE elevator.

  • A prominent and beautiful stairway encourages stair use.
  • The fully ADA-compliant elevator uses a “Regenerator” system to convert kinetic energy from braking into useable electricity, saving 60% of typical electrical use. 

Heating tubes for floorEXTREME HEATING EFFICIENCY
Ground-source heat pump and in-floor radiant system heat the building extremely efficiently.

  • Heat pump converts 53° water from underground tubes to 95° for heating the building.
  • Heat pump uses a compressor to extract heat and increase temperature in the radiant heat system.

ACTIVE DESIGN
Building design encourages physical activity to reduce energy use and improve health.

  • To promote human health, occupants of the building are greeted with an inviting stairway with views of downtown Seattle and Puget Sound
  • The average adult will burn 3,900 calories over the course of a year by taking the stairs, equal to a pound of weight gain. 

Bullitt Centre wooden interiorTALL TIMBERS REDUCE THE CARBON FOOTPRINT
FSC-certified heavy timber structure reduces carbon footprint and adds to beauty of the building interiors.

  • Forest Stewardship Council Certified timber framing supports the building above a concrete base.
  • All wood from within 1000 km, all steel and concrete from within 500 km.
  • 545 metric tons of CO2 are sequestered in the wood.

WETLAND FILTERS
Constructed wetland filters greywater before it is infiltrated back into the soil.

  • Wastewater filters through the constructed wetland so plants can absorb the organic matter.
  • Up to 500 gallons can be filtered per day.

Bullitt center solar panelsA BROAD CANOPY ARRAY
The PV array generates as much electricity as the Bullitt Center uses in a year.

  • The photovoltaic array spreads out like the canopy of a tree to capture solar power for the building.
  • 230,000 kilowatt hours per year is the expected total energy generation by on-site photovoltaic array.
  • There are 575 solar panels in the Bullitt’s array.

MAXIMISES DAYLIGHT, MINIMISES GLARE
Automated blinds integrated with the operable windows maximize daylight and minimize glare on workstations.

  • Integrated system of triple-pane glazing and deployable exterior shades helps maintain interior temps.
  • Operable windows move straight out to maximize ventilation.
  • Windows designed by Shuco and manufactured by Goldfinch Brothers in Everett, WA.

RIDE. RACK. RINSE. REPEAT.
Safe bike storage, onsite showers and a repair station encourage bicycle use.

  • Bike garage replaces onsite car parking.
  • Parking for 29 bicycles in a covered garage, along with a repair station.
  • Each bathroom has an accessible shower.

WARMTH RECOVERY
Warmth is removed from the air before it is exhausted from the building.

  • Uses tempered exhaust air from the building to pre-heat incoming air.
  • Honeycombed’ heat transfer wheel turns slowly to maximize heat transfer and eliminate cross-contamination.
  • Approximately 65% of the heat is transferred.

For more on the Bullitt Center philosophy, construction and breakthrough green technologies go to http://www.bullittcenter.org/


Replublished from the Bullitt Center's feature http://www.bullittcenter.org/building/building-features/

 



 

  »A CONCLUSION ON THE INCLUSION - RISK OF SPONTANEOUS GLASS FAILURES
  »RESIDENTIAL POOLS AND THE NEW NZBC F9/AS1 AND F9/AS2
  »HEALTH & SAFETY AND EXPLOSIVES UPDATES
  »UPDATES TO, PLASTER BOARD, PAINTING & TREATMENT STANDARDS
  »BUILDING CODE AMENDMENTS 2017 OVERVIEW
  »MORE INFORMATION ON NZS 4223 AND NZS 3604 UPDATES
  »NEW RESTRICTIONS ON COMBUSTIBLE EXTERNAL CLADDING
  »NEW SLIP RESISTANCE AND AS 4586
  »AS/NZS 5601.1 AND THE AFFECT ON G4, G10 AND G11
  »AS/NZS 3500 AND THE AFFECT ON G12 AND G13
  »CHANGES TO H1 AND THE AFFECTS OF THE NEW NZS 4218
  »UPDATING WORK SECTIONS IN MASTERSPEC
  »STEEL REINFORCEMENT MESH FOR CONCRETE - CLARIFICATION
  »NEW ELECTRICAL STANDARDS
  »NEW AS/NZS 1252 STANDARDS FOR BOLTS, NUTS & WASHERS
  »SPECIFYING MEMBRANE LEAK TEST METHOD AT DESIGN STAGE
  »REFRIGERANTS AND REFRIGERATING SYSTEMS - NEW STANDARDS
  »NEW ACOUSTIC STANDARD AS/NZS 2107 PROMPTS OTHER CHANGES
  »MBIE AMEND 28 ACCEPTABLE SOLUTIONS AND 10 VERIFICATION METHODS
  »NEW GEOTECHNICAL ENGINEERING GUIDANCE FROM MBIE AND THE NZGS
  »CHANGES TO SEISMIC DESIGN REQUIREMENTS FOR SUSPENDED CEILINGS
  »NEW MBIE PRACTICE ADVISORIES ON NON-STRUCTURAL BUILDING ELEMENTS
  »CLARIFICATION ON TESTING OF GRADE 500E DUCTILE STEEL MESH
  »NEW STANDARD FOR PLAYGROUND EQUIPMENT AND SURFACING COMING INTO EFFECT
  »NEW POOL SAFETY LEGISLATION
  »ASBESTOS REMOVAL NEW CODE OF PRACTICE
  »NEW NZS 4246 INSULATION STANDARD
  »NZS 1170.5: 2004 NEW AMENDMENT
  »PHOTOVOLTAIC STANDARDS CHANGE
  »UPDATES TO GLAZING IN BUILDINGS STANDARDS NZS 4223
  »DESIGNING FOR COUNTER TERRORISM
  »MASTERSPEC TENDER FORMS UPDATED
  »AS/NZS 1170.2:2011 NEW AMENDMENT
  »NSW APARTMENT DESIGN GUIDE
  »DESIGNING SCHOOLS IN NEW ZEALAND
  »THE GREENEST COMMERCIAL BUILDING IN THE WORLD
  »CONSTRUCTION CONTRACTS ACT NOW INCLUDES DESIGNERS, ENGINEERS, QS'S
  »GOOD PRACTICE GUIDELINES - EXCAVATION SAFETY
  »CHANGES TO GENERIC SECTION 8430 FENCES
  »MASTERSPEC ELECTRICAL SECTIONS UPDATES
  »NEW SECTION 7628 VRF AIR-CONDITIONING SYSTEM
  »NEW FIRE SAFETY SYSTEMS SECTIONS
  »FIRE EXTINGUISHERS - MATCHING THE HAZARD
  »PASSIVE VENTILATION IN THE CLASSROOM – A NEW STUDY
  »NEW SECTION 7383 FIRE & SMOKE CURTAINS
  »NEW SECTION 7371 UNDERGROUND FIRE HYDRANTS
  »NEW SECTION 7372 FIRE HYDRANT SYSTEMS FOR BUILDINGS
  »NEW GLASS BARRIER REQUIREMENTS FROM 1 JUNE 2016
  »NOW YOU CAN HIGHLIGHT IN MASTERSPEC NEXTGEN2
  »MBIE - QUICK GUIDE TO PRODUCT SUBSTITUTION
  »COMPLAINTS ABOUT NON-COMPLIANT BUILDING PRODUCTS
© 2017 Construction Information Limited
Construction Information Limited Construction Information
Powered by streamSWEET CMS  
Feedback